Merge "Update gate jobs as per the 2025.1 cycle testing runtime"

This commit is contained in:
Zuul 2024-12-01 18:34:45 +00:00 committed by Gerrit Code Review
commit 87bc7ead01

View File

@ -60,6 +60,15 @@
name: mistral-devstack
parent: mistral-devstack-tempest-base
# TODO(gmann): As per the 2025.1 testing runtime, we need to run at least
# one job on jammy. This job can be removed in the next cycle(2025.2).
- job:
name: mistral-devstack-jammy
description: This is integrated job testing on Ubuntu jammy(22.04)
parent: mistral-devstack
nodeset: openstack-single-node-jammy
- job:
name: mistral-devstack-kombu
parent: mistral-devstack-tempest-base
@ -82,6 +91,7 @@
check:
jobs:
- mistral-devstack
- mistral-devstack-jammy
- mistral-devstack-tempest-ipv6-only
- mistral-devstack-non-apache-tempest-ipv6-only
- mistral-devstack-non-apache
@ -90,6 +100,7 @@
gate:
jobs:
- mistral-devstack
- mistral-devstack-jammy
- mistral-devstack-tempest-ipv6-only
- mistral-devstack-non-apache-tempest-ipv6-only
- mistral-devstack-non-apache