a044cd9d70
For a given resource find out the current limits for the project. If there are no per project limits look up the registered limits that act as a default for when there are no project limits. Future patches will look at comparing these limits with the current and proposed resource usage to enforce the limits. Change-Id: Ia5ced4a46833b194f397ac936b99b0c9573b50d1 Co-Authored-By: wangxiyuan <wangxiyuan1007@gmail.com> Co-Authored-By: Lance Bragstad <lbragstad@gmail.com>